Clamp: 1-2 hours at 68-120 degrees F. Best at room temperature. Cure time: 80% in 1-2 hours. Allow bond to cure for 24 hours.

how long does it take 2 part epoxy to dry? Full cure of a two part epoxy can be several days. However adequate strength for further assembly, or packaging can be reached within minutes or hours. To increase full cure speed, heat can be used. The general rule of thumb is for every 10C increase in temperature the cure time is cut in half.

Thereof, how long does it take for Gorilla epoxy to set?

Apply: After mixing is complete, apply Gorilla Epoxy within 5 minutes. The epoxy mixture will continue to thicken and the bond strength will decrease the longer you wait to apply. Clamp: To reach maximum bond strength, clamp project together and leave undisturbed. Final Cure: 100% in 24 hours for load bearing weight.

How much weight Gorilla Glue holds?

15 lbs